Progress:

  • Completely disassembled the old IS test setup.
  • Designed new Y-rail and blind joint jigs.
  • Drilled the new blind joint holes using the updated jig.
  • Partially assembled the frame and checked the fitment of the bottom panel.

The slightly longer closed-loop belts also arrived just in time for the build. These are genuine Gates belts now, and not some no-name 610mm GT2s, primarily for Ender 3 dual Z designs.