Build Log 3 - Monolith Zero Development
·
·
I got a little carried away with the M0 build today, so the thermal performance posts will have to wait until tomorrow. Yes, I'll probably split it into two, because it's a lot of data and explanation.
M0 Progress:
- Finished the frame assembly, the 2040 is still an excellent tool for these spacings.
- Installed the bottom panel and the 8mm ID bearings.
- Countersunk the stepper plates by hand.
- Put together the stepper mount assemblies.
- Installed the Y-rails on their plates using the jig.
