Design Goals - Monolith Z Concept
·
·
I've been thinking about the Z quite a lot in the last few days and the concepts I'm sketching up are getting closer and closer to what soon can be considered prototype-worthy.
Based on the poll and by looking at other Z designs I came up with the following design goals (without going into details of the implementation):
- SLM, very little post-processing
- 1st config: Trident drop-in replacement (3 lead screws, unchanged Z motor locations)
- 2nd config: V2 fixed gantry upgrade path (4 belts, unchanged Z drives, and idlers)
- 2-in-1 Z arms
- 3-point kinematic or 4-point with elastic averaging that still allows for length change in XY
- a controlled amount of XY preload to take out the slack and improve the rigidity regardless of the rail preload, etc
- pivot points very close to the Z rails
Overall, I'm pretty hyped about the concept because I didn't think there was a chance to have something as unique as the toolhead's layout idea in this short time.